Electoral authorities reported voter participation of more than 80% and planned to release initial results within two hours.
—
Regina Garcia Cano,
Chicago Tribune,
14 Apr. 2025
Musk’s company had initially planned to support its Colossus supercomputer which uses around 150 megawatts of power with 100,000 H100 GPUs, even more when upgraded to 200,000.
—
Bojan Stojkovski,
Interesting Engineering,
13 Apr. 2025
Given the sensitivity of the LiDAR to performance to temperature, Komatsu engineered specialized thermal management solutions to address a wide operating range (-50 °C - +65 °C).
—
Sabbir Rangwala,
Forbes,
24 Mar. 2025
This reactor stands out because its sophisticated solar absorber is carefully engineered to retain as much heat as possible while reducing losses.
—
Aamir Khollam,
Interesting Engineering,
24 Mar. 2025
Examples are automatically compiled from online sources to
show current usage.Read More
Opinions expressed in the examples do not represent those of Merriam-Webster or its editors.
Send us feedback.
Share